COMPLETED MOBU PROJECTS
View all completed
projects
Row houses, government buildings or apartments: find inspiration in the projects we have built over the years.
Completed projects
Contemporary home in Rosà
Construction of a two-family home built using the Mobu dry prefabricated system in Rosà (VI). Starting from a design provided to us by the professional engaged by the client, which called for the demolition of part of the existing building, engineering work was done on the new structure adjacent to the remaining portion of the home. The home is ma... Read all
Completed projects
Home C-1913
Construction of a home with three property units built using the Mobu dry prefabricated system in Casalgrande (RE). Starting from a design provided to us by the professional engaged by the client, which called for the demolition of the existing building, engineering work was done on the new structure next to adjacent the home. The home is made from... Read all
Completed projects
M-14 how houses
Renovation of a residential unit in a row house through the use of the Mobu dry prefabricated system in Miane (TV). The project involved changes to the interior layout only, keeping a part of the exterior masonry for historical reasons, as well as changes to the building's elevations. A new steel-and-wood load-bearing structure was built to make th... Read all
Completed projects
Single-family home C-312
In Crevada, province of Treviso, we built a home that stands as an exceptional symbol of innovation and design. This single-family residence was designed and built using the Mobu dry prefabricated construction system, which has revolutionised the traditional concept of construction.... Read all
Completed projects
Single-family homes P-36
Design and construction of two homes built using the Mobu dry prefabricated construction system. Pove del Grappa (VI)... Read all
Completed projects
Sustainable contemporary home in Cornedo
A splendid single-family home was built in Cornedo (VI) using the Mobu dry prefabricated system. Starting from a design provided by the professional engaged by the client, engineering work was done on the new structure. The home was built using a structure composed of steel pillars and beams, whereas the ceilings are made from wood. The walls consi... Read all
Completed projects
Two-family home R-212
Construction of a two-family home built using the Mobu dry prefabricated system in Rosà (VI). Starting from a design provided to us by the professional engaged by the client, which called for the demolition of part of the existing building, engineering work was done on the new structure adjacent to the remaining portion of the home. The home is ma... Read all